1 00:00:15,430 --> 00:00:13,110 saturn five quarterly film report number 2 00:00:19,109 --> 00:00:15,440 nine covers progress during the period 3 00:00:21,830 --> 00:00:19,119 december 1st 1964 through february 28 4 00:00:23,910 --> 00:00:21,840 1965 5 00:00:26,310 --> 00:00:23,920 development manufacturing and testing of 6 00:00:28,230 --> 00:00:26,320 s1c stage components by the boeing 7 00:00:31,589 --> 00:00:28,240 company and the marshall center 8 00:00:34,389 --> 00:00:31,599 continued throughout the quarter 9 00:00:36,310 --> 00:00:34,399 at marshall the first s1ct horizontal 10 00:00:37,430 --> 00:00:36,320 assembly operation began early in 11 00:00:39,430 --> 00:00:37,440 december 12 00:00:42,869 --> 00:00:39,440 the thrust structure fuel tank assembly 13 00:00:44,709 --> 00:00:42,879 for the s1ct static firing stage was 14 00:00:46,869 --> 00:00:44,719 transferred to the assembly area from 15 00:00:49,029 --> 00:00:46,879 the vertical assembly building and was 16 00:00:51,670 --> 00:00:49,039 mated on december 18th to the forward 17 00:00:54,549 --> 00:00:51,680 skirt lox tank inner tank assembly which 18 00:00:55,830 --> 00:00:54,559 had been moved from the vab last quarter 19 00:00:58,069 --> 00:00:55,840 cable installation and other 20 00:01:01,349 --> 00:00:58,079 miscellaneous mechanical assembly work 21 00:01:03,910 --> 00:01:01,359 continued during the report period 22 00:01:06,870 --> 00:01:03,920 in early february a dummy f-1 engine was 23 00:01:09,190 --> 00:01:06,880 installed on the s-1 ct vehicle to check 24 00:01:11,109 --> 00:01:09,200 out various fittings and connections 25 00:01:12,390 --> 00:01:11,119 the operation went so smoothly that the 26 00:01:14,710 --> 00:01:12,400 engine was installed 27 00:01:17,749 --> 00:01:14,720 fittings checked and the engine removed 28 00:01:19,749 --> 00:01:17,759 all within four hours 29 00:01:21,510 --> 00:01:19,759 at the end of the quarter the saturn v 30 00:01:24,710 --> 00:01:21,520 program reached one of its most 31 00:01:26,950 --> 00:01:24,720 significant milestones when the s-1 ct 32 00:01:29,749 --> 00:01:26,960 was installed at marshall's new s1c 33 00:01:32,469 --> 00:01:29,759 static test stand for the first s1c 34 00:01:34,870 --> 00:01:32,479 stage single engine test firing expected 35 00:01:36,710 --> 00:01:34,880 in early april 36 00:01:39,590 --> 00:01:36,720 notable progress in the manufacture of 37 00:01:41,990 --> 00:01:39,600 assemblies for s1cs structural test 38 00:01:44,310 --> 00:01:42,000 components was made this quarter with 39 00:01:45,670 --> 00:01:44,320 completion and hydrostatic testing of 40 00:01:47,190 --> 00:01:45,680 the lox tank 41 00:01:49,030 --> 00:01:47,200 and mating of the fuel tank to the 42 00:01:52,789 --> 00:01:49,040 thrust structure which had arrived at 43 00:01:55,350 --> 00:01:52,799 marshall from michoud in late december 44 00:01:57,429 --> 00:01:55,360 meanwhile the marshall center's new load 45 00:01:59,830 --> 00:01:57,439 test tower was placed in operation in 46 00:02:01,830 --> 00:01:59,840 february when structural testing got 47 00:02:05,429 --> 00:02:01,840 underway on the first intertank for the 48 00:02:10,309 --> 00:02:07,830 maximum aerodynamic loads expected in 49 00:02:11,750 --> 00:02:10,319 flight were simulated by two load rings 50 00:02:13,910 --> 00:02:11,760 and the bootstrap arrangement of 51 00:02:15,350 --> 00:02:13,920 hydraulic cylinders tension straps and 52 00:02:17,589 --> 00:02:15,360 load cells 53 00:02:20,390 --> 00:02:17,599 the inner tank buckled at 110 percent of 54 00:02:21,750 --> 00:02:20,400 the axial load and 117 percent of the 55 00:02:24,550 --> 00:02:21,760 moment load 56 00:02:27,430 --> 00:02:24,560 since a 140 percent factor is required 57 00:02:29,430 --> 00:02:27,440 in all man-rated saturn v hardware a 58 00:02:33,030 --> 00:02:29,440 strengthened inner tank built at michoud 59 00:02:35,830 --> 00:02:33,040 will later undergo similar testing 60 00:02:38,630 --> 00:02:35,840 following removal of the intertank the 61 00:02:40,710 --> 00:02:38,640 fuel tank thrust structure assembly was 62 00:02:42,869 --> 00:02:40,720 installed in the load test tower 63 00:02:45,670 --> 00:02:42,879 structural testing of this assembly is 64 00:02:47,750 --> 00:02:45,680 scheduled next quarter 65 00:02:50,070 --> 00:02:47,760 meanwhile bulkhead fabrication 66 00:02:54,070 --> 00:02:50,080 progressed steadily on the first two s1c 67 00:02:57,110 --> 00:02:54,080 flight stages s1c1 and s1c2 68 00:02:59,830 --> 00:02:57,120 another bulkhead for the s1cf facility's 69 00:03:03,589 --> 00:02:59,840 checkout stage lox tank was finished in 70 00:03:06,229 --> 00:03:03,599 early february and shipped to michoud 71 00:03:09,589 --> 00:03:06,239 cylindrical skin assembly for the s1c1 72 00:03:11,670 --> 00:03:09,599 lux tank was also underway 73 00:03:14,869 --> 00:03:11,680 at michoud the new vertical assembly 74 00:03:17,350 --> 00:03:14,879 building became operational in january 75 00:03:20,390 --> 00:03:17,360 initial use of the vab was an assembly 76 00:03:22,630 --> 00:03:20,400 of the fuel tank for the s1cd or dynamic 77 00:03:25,910 --> 00:03:22,640 test stage when the fuel tank forward 78 00:03:28,550 --> 00:03:25,920 bulkhead and skin ring were mated 79 00:03:31,110 --> 00:03:28,560 on february 24th the forward and aft 80 00:03:33,430 --> 00:03:31,120 assemblies were joined to form the s1cd 81 00:03:35,589 --> 00:03:33,440 fuel tank 82 00:03:38,869 --> 00:03:35,599 the exclusion riser was installed on the 83 00:03:41,030 --> 00:03:38,879 s1cd lower fuel tank bulkhead purpose of 84 00:03:42,789 --> 00:03:41,040 the exclusion riser is to occupy space 85 00:03:44,630 --> 00:03:42,799 in the bottom of the tank which would 86 00:03:46,949 --> 00:03:44,640 otherwise hold fuel that would never be 87 00:03:49,190 --> 00:03:46,959 used the displacement of this fuel by 88 00:03:52,949 --> 00:03:49,200 the exclusion riser results in a weight 89 00:03:55,910 --> 00:03:52,959 saving of some five thousand pounds 90 00:03:58,229 --> 00:03:55,920 bulkhead fabrication for s1cd was 91 00:04:01,110 --> 00:03:58,239 concluded in january with completion of 92 00:04:02,949 --> 00:04:01,120 the lower lox bulkhead 93 00:04:06,309 --> 00:04:02,959 fuel tank bulkhead assembly for the 94 00:04:08,390 --> 00:04:06,319 s-1cf facilities checkout stage began in 95 00:04:10,149 --> 00:04:08,400 january 96 00:04:11,670 --> 00:04:10,159 several major components were shipped 97 00:04:13,750 --> 00:04:11,680 about barge to the marshall center 98 00:04:15,589 --> 00:04:13,760 during the report period including the 99 00:04:17,830 --> 00:04:15,599 thrust structure and forward skirt for 100 00:04:21,189 --> 00:04:17,840 the structural test stage and the thrust 101 00:04:23,110 --> 00:04:21,199 structure for the first flight stage 102 00:04:25,270 --> 00:04:23,120 other components being manufactured by 103 00:04:28,390 --> 00:04:25,280 boeing michoud included the first of 104 00:04:30,469 --> 00:04:28,400 four fins for the structural test stage 105 00:04:33,430 --> 00:04:30,479 and upper faring frame assemblies which 106 00:04:35,189 --> 00:04:33,440 attach to the thrust structure 107 00:04:37,110 --> 00:04:35,199 the electro development corporation of 108 00:04:38,790 --> 00:04:37,120 seattle washington which manufactures 109 00:04:40,390 --> 00:04:38,800 various electronic components for 110 00:04:43,110 --> 00:04:40,400 telemetry systems 111 00:04:45,030 --> 00:04:43,120 is representative of the 2500 companies 112 00:04:47,430 --> 00:04:45,040 which keep supply lines of components 113 00:04:49,510 --> 00:04:47,440 and sub-assemblies moving on schedule to 114 00:04:51,510 --> 00:04:49,520 boeing michoud from all over the united 115 00:04:52,950 --> 00:04:51,520 states 116 00:04:55,350 --> 00:04:52,960 the brown engineering company of 117 00:04:58,070 --> 00:04:55,360 huntsville alabama also manufactures 118 00:05:00,469 --> 00:04:58,080 telemetry equipment 119 00:05:03,030 --> 00:05:00,479 another typical boeing supplier borns 120 00:05:04,629 --> 00:05:03,040 incorporated of riverside california 121 00:05:07,350 --> 00:05:04,639 makes some of the smallest pressure 122 00:05:17,029 --> 00:05:07,360 transducers seven tenths of a cubic inch 123 00:05:22,390 --> 00:05:19,590 at the s2 static test facility at santa 124 00:05:25,749 --> 00:05:22,400 susana a successful single engine main 125 00:05:28,310 --> 00:05:25,759 stage firing of 9.8 seconds duration on 126 00:05:30,230 --> 00:05:28,320 december 11th highlighted activity at 127 00:05:32,310 --> 00:05:30,240 the battleship test stand 128 00:05:34,150 --> 00:05:32,320 the test marked the first occasion in 129 00:05:36,710 --> 00:05:34,160 which the j-2 engine had been fully 130 00:05:38,469 --> 00:05:36,720 fired as an integral component of the s2 131 00:05:40,469 --> 00:05:38,479 propulsion system 132 00:05:42,710 --> 00:05:40,479 now that the single engine test program 133 00:05:44,390 --> 00:05:42,720 is completed all battleship effort is 134 00:05:47,830 --> 00:05:44,400 being directed toward activation for 135 00:05:50,870 --> 00:05:47,840 cluster firing all j2 engines as well as 136 00:05:54,629 --> 00:05:50,880 all gse or systems development devices 137 00:05:57,029 --> 00:05:54,639 have been received at santa susana 138 00:05:59,830 --> 00:05:57,039 a preliminary system checkout of the j2 139 00:06:02,469 --> 00:05:59,840 engine gimbal actuation system installed 140 00:06:04,710 --> 00:06:02,479 in the s2 electromechanical mockup was 141 00:06:07,189 --> 00:06:04,720 performed this quarter at downey by the 142 00:06:09,510 --> 00:06:07,199 s2 prime contractor north american 143 00:06:11,510 --> 00:06:09,520 aviation's space and information systems 144 00:06:14,150 --> 00:06:11,520 division 145 00:06:16,469 --> 00:06:14,160 in the gse checkout and test area of the 146 00:06:18,710 --> 00:06:16,479 electro mechanical mock-up facility 147 00:06:20,870 --> 00:06:18,720 check out of control room gse racks is 148 00:06:22,710 --> 00:06:20,880 expected to be completed in march 149 00:06:25,990 --> 00:06:22,720 the control room contains a computer 150 00:06:28,710 --> 00:06:26,000 complex a telemetry checkout station rf 151 00:06:31,029 --> 00:06:28,720 station electrical checkout station and 152 00:06:32,870 --> 00:06:31,039 digital data checkout station 153 00:06:34,469 --> 00:06:32,880 the major subcontractor effort for 154 00:06:36,629 --> 00:06:34,479 delivery of gsc for the 155 00:06:38,150 --> 00:06:36,639 electromechanical mock-up is being 156 00:06:40,309 --> 00:06:38,160 accomplished by brown engineering 157 00:06:43,110 --> 00:06:40,319 company of huntsville consolidated 158 00:06:44,870 --> 00:06:43,120 electrodynamics corporation of pasadena 159 00:06:47,350 --> 00:06:44,880 and computer data corporation of 160 00:06:49,749 --> 00:06:47,360 minneapolis 161 00:06:52,070 --> 00:06:49,759 an s2 program milestone was reached on 162 00:06:54,629 --> 00:06:52,080 february 1st with completion of the 163 00:06:56,070 --> 00:06:54,639 structural test stage at s and id's seal 164 00:06:57,909 --> 00:06:56,080 beach facility 165 00:06:59,830 --> 00:06:57,919 primary aims of the structural test 166 00:07:01,909 --> 00:06:59,840 program will be to certify the 167 00:07:03,990 --> 00:07:01,919 structural integrity of the complete 168 00:07:05,909 --> 00:07:04,000 stage when subjected to critical design 169 00:07:07,830 --> 00:07:05,919 loads and simulated temperature 170 00:07:11,189 --> 00:07:07,840 environments and to determine the 171 00:07:12,790 --> 00:07:11,199 stiffness of the thrust structure 172 00:07:15,270 --> 00:07:12,800 the stage was removed from the vertical 173 00:07:16,870 --> 00:07:15,280 assembly building on february second the 174 00:07:18,870 --> 00:07:16,880 stage was lifted and rotated to a 175 00:07:21,110 --> 00:07:18,880 horizontal position for loading on the 176 00:07:23,110 --> 00:07:21,120 stage transporter which hauled it to the 177 00:07:24,070 --> 00:07:23,120 structural test tower for installation 178 00:07:25,909 --> 00:07:24,080 there 179 00:07:27,589 --> 00:07:25,919 fabrication of jigs and fixtures 180 00:07:29,909 --> 00:07:27,599 required for structural testing is 181 00:07:31,749 --> 00:07:29,919 complete and instrumentation of stage 182 00:07:34,070 --> 00:07:31,759 and tower is progressing toward the 183 00:07:36,390 --> 00:07:34,080 scheduled start of testing in april 184 00:07:39,110 --> 00:07:36,400 after testing the stage will be modified 185 00:07:41,350 --> 00:07:39,120 to a dynamic stage configuration deleted 186 00:07:42,870 --> 00:07:41,360 during a recent reprogramming and is 187 00:07:46,390 --> 00:07:42,880 slated for delivery to marshall in 188 00:07:49,350 --> 00:07:46,400 november for dynamic testing 189 00:07:51,350 --> 00:07:49,360 also at seal beach fabrication of the s2 190 00:07:53,589 --> 00:07:51,360 common bulkhead test tank was 191 00:07:56,550 --> 00:07:53,599 highlighted by completion and ultrasonic 192 00:07:58,550 --> 00:07:56,560 inspection using dye penetrant solution 193 00:08:00,629 --> 00:07:58,560 of the common bulkhead and by 194 00:08:02,469 --> 00:08:00,639 circumferential welding of liquid 195 00:08:03,749 --> 00:08:02,479 hydrogen tank cylinders number one and 196 00:08:06,230 --> 00:08:03,759 number two 197 00:08:08,469 --> 00:08:06,240 welding of the common bulkhead and lh2 198 00:08:11,029 --> 00:08:08,479 bulkhead to the cylinder assembly was 199 00:08:12,950 --> 00:08:11,039 also completed 200 00:08:14,790 --> 00:08:12,960 construction of the common bulkhead test 201 00:08:17,909 --> 00:08:14,800 tank facility at santa susana was 202 00:08:19,909 --> 00:08:17,919 completed in february the cbt test 203 00:08:23,110 --> 00:08:19,919 article is scheduled to be received at 204 00:08:25,350 --> 00:08:23,120 santa susana in april 205 00:08:27,589 --> 00:08:25,360 final assembly of the all systems stage 206 00:08:29,510 --> 00:08:27,599 was begun in february the first 207 00:08:31,589 --> 00:08:29,520 operation being the welding of cylinder 208 00:08:34,389 --> 00:08:31,599 number three to number four 209 00:08:36,949 --> 00:08:34,399 cylinder number five was later welded to 210 00:08:39,029 --> 00:08:36,959 three and four 211 00:08:41,350 --> 00:08:39,039 all major structural components such as 212 00:08:43,269 --> 00:08:41,360 bulkheads and thrust structure necessary 213 00:08:45,430 --> 00:08:43,279 for vertical assembly of the all system 214 00:08:48,070 --> 00:08:45,440 stage are scheduled for completion by 215 00:08:50,070 --> 00:08:48,080 the end of march 216 00:08:52,389 --> 00:08:50,080 assembly of major structural components 217 00:08:54,550 --> 00:08:52,399 is also in progress at seal beach for 218 00:08:57,990 --> 00:08:54,560 the facility's checkout stage 219 00:09:01,030 --> 00:08:58,000 final assembly will begin next quarter 220 00:09:02,790 --> 00:09:01,040 at snid's tulsa facility manufacturer of 221 00:09:09,990 --> 00:09:02,800 components continued for the first two 222 00:09:14,389 --> 00:09:12,230 a ceremony at douglas aircraft companies 223 00:09:16,550 --> 00:09:14,399 huntington beach california facility 224 00:09:19,829 --> 00:09:16,560 early in december marked the formal 225 00:09:21,829 --> 00:09:19,839 turnover to nasa of the first s-4b stage 226 00:09:25,030 --> 00:09:21,839 built by the company 227 00:09:26,389 --> 00:09:25,040 the stage designated s4bd was then 228 00:09:29,509 --> 00:09:26,399 shipped from the west coast to the 229 00:09:33,590 --> 00:09:29,519 marshall center for use in saturn 1b and 230 00:09:35,509 --> 00:09:33,600 saturn 5 dynamic test programs 231 00:09:38,310 --> 00:09:35,519 at marshall the stage was installed in 232 00:09:40,949 --> 00:09:38,320 the saturn 1 1b dynamic test stand in 233 00:09:42,870 --> 00:09:40,959 mid-january as part of the saturn 1b 234 00:09:45,030 --> 00:09:42,880 vehicle 235 00:09:46,710 --> 00:09:45,040 meanwhile back at huntington beach after 236 00:09:50,230 --> 00:09:46,720 completion of checkout and painting of 237 00:09:52,070 --> 00:09:50,240 the facility's checkout stage s4bf the 238 00:09:55,190 --> 00:09:52,080 stage was moved to douglas sacramento 239 00:09:57,110 --> 00:09:55,200 test area on february 18th the stage was 240 00:09:59,509 --> 00:09:57,120 installed in beta test stand number 241 00:10:02,310 --> 00:09:59,519 three for propellant loading tests 242 00:10:04,310 --> 00:10:02,320 scheduled next quarter 243 00:10:06,470 --> 00:10:04,320 fabrication and assembly of components 244 00:10:09,110 --> 00:10:06,480 for the first and second s-4b flight 245 00:10:13,190 --> 00:10:09,120 stages for the saturn 5 program 246 00:10:14,870 --> 00:10:13,200 continued at douglas santa monica plant 247 00:10:17,030 --> 00:10:14,880 also in progress during the report 248 00:10:20,389 --> 00:10:17,040 period was douglas structural test 249 00:10:22,310 --> 00:10:20,399 program involving various s4b components 250 00:10:24,230 --> 00:10:22,320 such as this static test thrust 251 00:10:26,230 --> 00:10:24,240 structure 252 00:10:28,470 --> 00:10:26,240 another item undergoing qualification 253 00:10:30,550 --> 00:10:28,480 testing was this liquid oxygen tank 254 00:10:33,110 --> 00:10:30,560 assembly 255 00:10:34,949 --> 00:10:33,120 and an s4b forward skirt was tested to 256 00:10:39,990 --> 00:10:34,959 failure to determine maximum load 257 00:10:45,030 --> 00:10:42,710 at the sacramento test area the s4b 258 00:10:47,509 --> 00:10:45,040 battleship firing test program continued 259 00:10:50,470 --> 00:10:47,519 during december with successful firings 260 00:10:51,829 --> 00:10:50,480 varying from 10 seconds to 416 seconds 261 00:10:54,870 --> 00:10:51,839 in duration 262 00:10:57,750 --> 00:10:54,880 the 416 second firing was the longest 263 00:11:01,430 --> 00:10:57,760 s4b test to date 264 00:11:03,269 --> 00:11:01,440 in late january j2 engine number 2003 265 00:11:05,350 --> 00:11:03,279 was removed from the battleship test 266 00:11:07,910 --> 00:11:05,360 stand and was replaced with engine 267 00:11:10,710 --> 00:11:07,920 number 2013 which has a gimbal 268 00:11:12,630 --> 00:11:10,720 capability for the continuation of tests 269 00:11:15,030 --> 00:11:12,640 in addition to hot firings such 270 00:11:17,269 --> 00:11:15,040 development tests as engine chill down 271 00:11:25,990 --> 00:11:17,279 and propellant utilization were also 272 00:11:30,509 --> 00:11:28,230 rocketdyne's f1 engine flight rating 273 00:11:33,430 --> 00:11:30,519 test program which began november 16 274 00:11:35,750 --> 00:11:33,440 1964 at the edwards rocket engine test 275 00:11:37,990 --> 00:11:35,760 site in california was successfully 276 00:11:40,790 --> 00:11:38,000 concluded on december 16th 277 00:11:43,430 --> 00:11:40,800 engine number 2004 installed in test 278 00:11:45,829 --> 00:11:43,440 stand a1 was utilized in the safety 279 00:11:48,630 --> 00:11:45,839 limits series of tests 280 00:11:51,190 --> 00:11:48,640 while engine number 2006 installed in 281 00:11:53,509 --> 00:11:51,200 stand 1d was used for the calibration 282 00:11:55,829 --> 00:11:53,519 series 283 00:11:57,430 --> 00:11:55,839 at the high flow water facility a new 284 00:11:59,590 --> 00:11:57,440 flow collection system has been 285 00:12:01,670 --> 00:11:59,600 installed to provide an accurate means 286 00:12:04,069 --> 00:12:01,680 of measuring the volume of flow through 287 00:12:05,910 --> 00:12:04,079 selected orifice groups this data will 288 00:12:08,870 --> 00:12:05,920 be used in the development of injectors 289 00:12:10,870 --> 00:12:08,880 with improved performance 290 00:12:13,590 --> 00:12:10,880 rocketdyne is conducting qualification 291 00:12:15,590 --> 00:12:13,600 tests on a number of f1 components the 292 00:12:17,350 --> 00:12:15,600 heat exchanger check valve which 293 00:12:19,590 --> 00:12:17,360 prevents locks from the propellant tank 294 00:12:22,150 --> 00:12:19,600 from entering the system during standby 295 00:12:24,790 --> 00:12:22,160 was installed on the 15-ton shaker for 296 00:12:26,550 --> 00:12:24,800 vibration testing 297 00:12:28,310 --> 00:12:26,560 the flight combustion monitor has 298 00:12:30,389 --> 00:12:28,320 undergone a number of tests including 299 00:12:34,470 --> 00:12:30,399 function testing to determine frequency 300 00:12:36,710 --> 00:12:34,480 response amplitude and time delay 301 00:12:38,629 --> 00:12:36,720 several types of f1 engine insulation 302 00:12:41,350 --> 00:12:38,639 fastener samples have been subjected to 303 00:12:43,509 --> 00:12:41,360 stress tests to determine fastener size 304 00:12:45,269 --> 00:12:43,519 and spacing 305 00:12:47,350 --> 00:12:45,279 structural integrity of the f1 306 00:12:49,590 --> 00:12:47,360 electrical interface panel has been 307 00:12:51,430 --> 00:12:49,600 successfully proved in a series of tests 308 00:12:59,430 --> 00:12:51,440 in which the panel was loaded along 309 00:13:03,990 --> 00:13:01,430 at the marshall center propulsion system 310 00:13:06,470 --> 00:13:04,000 testing of three of the five f1 engines 311 00:13:09,190 --> 00:13:06,480 for the s1c static firing stage has been 312 00:13:11,910 --> 00:13:09,200 accomplished test completion is expected 313 00:13:14,949 --> 00:13:11,920 by the middle of march 314 00:13:17,110 --> 00:13:14,959 at marshall's new f-1 static test stand 315 00:13:19,590 --> 00:13:17,120 interior work continued in preparation 316 00:13:24,150 --> 00:13:19,600 for initial engine testing scheduled for 317 00:13:28,790 --> 00:13:26,150 a milestone of vital importance to the 318 00:13:31,590 --> 00:13:28,800 entire saturn apollo program was reached 319 00:13:33,430 --> 00:13:31,600 on december 9th when rocketdyne's j2 320 00:13:35,990 --> 00:13:33,440 engine successfully demonstrated its 321 00:13:38,470 --> 00:13:36,000 ability to stop and restart in a static 322 00:13:40,710 --> 00:13:38,480 firing conducted at santa susana 323 00:13:43,829 --> 00:13:40,720 the test engine was operated initially 324 00:13:46,150 --> 00:13:43,839 for 165 seconds and shut down 325 00:13:48,870 --> 00:13:46,160 following a 75-minute simulated coast 326 00:13:51,110 --> 00:13:48,880 period the engine was restarted the 327 00:13:53,030 --> 00:13:51,120 restart was cut off at seven seconds 328 00:13:53,910 --> 00:13:53,040 because of an erroneous helium pressure 329 00:13:56,150 --> 00:13:53,920 reading 330 00:13:59,829 --> 00:13:56,160 after six minutes the engine was started 331 00:14:03,509 --> 00:13:59,839 again and run for 310 seconds simulating 332 00:14:05,430 --> 00:14:03,519 the s4b stage in flight 333 00:14:08,069 --> 00:14:05,440 following successful completion last 334 00:14:10,470 --> 00:14:08,079 quarter of j2 engine preliminary flight 335 00:14:11,829 --> 00:14:10,480 rating tests the test engine was removed 336 00:14:14,389 --> 00:14:11,839 from the stand and completely 337 00:14:16,790 --> 00:14:14,399 disassembled for a tear down inspection 338 00:14:18,470 --> 00:14:16,800 at rocketdyne's canoga park plant to 339 00:14:21,030 --> 00:14:18,480 determine the extent of wear on the 340 00:14:25,269 --> 00:14:21,040 engine after eighteen firings totaling 341 00:14:29,350 --> 00:14:27,670 on january twenty second acceptance 342 00:14:31,509 --> 00:14:29,360 testing of the first j2 flight 343 00:14:34,550 --> 00:14:31,519 configuration engine was conducted at 344 00:14:36,389 --> 00:14:34,560 santa susana and on january 26th the 345 00:14:40,230 --> 00:14:36,399 engine was delivered to douglas for use 346 00:14:43,030 --> 00:14:40,240 in its s-4b battleship program 347 00:14:44,949 --> 00:14:43,040 also at santa susana major modification 348 00:14:46,949 --> 00:14:44,959 of vertical test stand number three has 349 00:14:49,110 --> 00:14:46,959 been completed to provide improved 350 00:14:56,150 --> 00:14:49,120 propellant conditioning and increased 351 00:15:01,430 --> 00:14:58,470 vibration testing of the instrument unit 352 00:15:03,670 --> 00:15:01,440 designated as siu 200v 353 00:15:05,110 --> 00:15:03,680 got underway in late february 354 00:15:06,870 --> 00:15:05,120 the tests are being conducted for 355 00:15:08,150 --> 00:15:06,880 marshall by the wiley laboratories in 356 00:15:10,150 --> 00:15:08,160 huntsville 357 00:15:12,870 --> 00:15:10,160 although the 200v unit testing is 358 00:15:15,350 --> 00:15:12,880 actually a part of the saturn 1b program 359 00:15:18,389 --> 00:15:15,360 information gained will apply also to 360 00:15:20,470 --> 00:15:18,399 the saturn 5 program 361 00:15:24,790 --> 00:15:20,480 assembly of the dynamic test instrument 362 00:15:26,790 --> 00:15:24,800 unit siu 200 d 500d was completed 363 00:15:29,350 --> 00:15:26,800 february 1st at marshall with 364 00:15:32,069 --> 00:15:29,360 installation of dummy equipment the unit 365 00:15:33,590 --> 00:15:32,079 is for use in both the saturn 1b and 5 366 00:15:36,790 --> 00:15:33,600 programs 367 00:15:39,110 --> 00:15:36,800 assembly of siu-200s-500s 368 00:15:41,509 --> 00:15:39,120 a structural test unit was finished in 369 00:15:43,269 --> 00:15:41,519 late february 370 00:15:45,910 --> 00:15:43,279 the dynamic test unit was later 371 00:15:49,030 --> 00:15:45,920 installed atop the s4b dynamic test 372 00:15:51,350 --> 00:15:49,040 stage in marshall saturn 1 1b dynamic 373 00:15:54,550 --> 00:15:51,360 test stand where it underwent testing as 374 00:15:57,430 --> 00:15:54,560 part of the saturn 1b vehicle 375 00:15:59,430 --> 00:15:57,440 structural buildup of the 500 fs flight 376 00:16:00,790 --> 00:15:59,440 systems instrument unit began in 377 00:16:02,310 --> 00:16:00,800 mid-february 378 00:16:04,870 --> 00:16:02,320 this unit will be shipped to douglas 379 00:16:07,269 --> 00:16:04,880 next fall for use in testing there 380 00:16:10,230 --> 00:16:07,279 assembly of the facility's checkout unit 381 00:16:13,189 --> 00:16:10,240 500 f continued it will be sent to cape 382 00:16:15,590 --> 00:16:13,199 kennedy in june 383 00:16:18,150 --> 00:16:15,600 a breadboard version of the iu's launch 384 00:16:20,550 --> 00:16:18,160 vehicle digital computer used in 385 00:16:22,389 --> 00:16:20,560 guidance operations has been received at 386 00:16:24,629 --> 00:16:22,399 marshall from the manufacturer 387 00:16:27,269 --> 00:16:24,639 international business machines and is 388 00:16:29,509 --> 00:16:27,279 now being checked out and evaluated the 389 00:16:32,470 --> 00:16:29,519 first of the several prototype computers 390 00:16:35,030 --> 00:16:32,480 will be delivered next quarter 391 00:16:37,030 --> 00:16:35,040 at ibm's huntsville facility the first 392 00:16:39,430 --> 00:16:37,040 major piece of hard tooling for use in 393 00:16:42,069 --> 00:16:39,440 iu assembly a structural assembly 394 00:16:44,230 --> 00:16:42,079 fixture was received and installed early 395 00:16:46,310 --> 00:16:44,240 in the quarter 396 00:16:48,310 --> 00:16:46,320 installation calibration and checkout of 397 00:16:51,670 --> 00:16:48,320 one of ibm's two telemetry ground 398 00:16:54,310 --> 00:16:51,680 stations was also accomplished 399 00:16:56,710 --> 00:16:54,320 at ibm space guidance center in oregon 400 00:16:58,069 --> 00:16:56,720 new york radiographic inspection was 401 00:16:59,910 --> 00:16:58,079 accomplished on the first piece of 402 00:17:02,629 --> 00:16:59,920 production hardware to enter the 403 00:17:04,710 --> 00:17:02,639 company's production cycle a magnesium 404 00:17:05,470 --> 00:17:04,720 casting which forms the base assembly 405 00:17:08,230 --> 00:17:05,480 for 406 00:17:10,470 --> 00:17:08,240 siu-201's emergency detection system 407 00:17:12,549 --> 00:17:10,480 distributor 408 00:17:15,110 --> 00:17:12,559 other machining operations underway at 409 00:17:17,270 --> 00:17:15,120 owego included a casting to be used in 410 00:17:19,270 --> 00:17:17,280 the launch vehicle data adapter a 411 00:17:25,189 --> 00:17:19,280 component of the guidance and control 412 00:17:29,350 --> 00:17:27,270 at the marshall center saturn 5 ground 413 00:17:31,270 --> 00:17:29,360 support equipment test facility 414 00:17:33,350 --> 00:17:31,280 installation of technical systems has 415 00:17:35,830 --> 00:17:33,360 been finished and checkout is now 416 00:17:37,510 --> 00:17:35,840 nearing completion 417 00:17:40,390 --> 00:17:37,520 build up of the facilities vehicle 418 00:17:42,789 --> 00:17:40,400 motion simulator by the prime contractor 419 00:17:46,630 --> 00:17:42,799 american machine and foundry company is 420 00:17:49,029 --> 00:17:46,640 approximately 25 percent complete 421 00:17:51,590 --> 00:17:49,039 a new landmark arose at marshall as the 422 00:17:53,909 --> 00:17:51,600 120 foot tall acceleration test and 423 00:17:55,510 --> 00:17:53,919 calibration facility took shape 424 00:17:58,390 --> 00:17:55,520 the facility will contain a large 425 00:18:00,789 --> 00:17:58,400 centrifuge an acceleration tower and an 426 00:18:03,110 --> 00:18:00,799 acoustical chamber for testing guidance 427 00:18:05,909 --> 00:18:03,120 components 428 00:18:07,909 --> 00:18:05,919 at marshall's mississippi test facility 429 00:18:09,590 --> 00:18:07,919 the first of three static test stands 430 00:18:11,909 --> 00:18:09,600 towered more than 100 feet above its 431 00:18:14,630 --> 00:18:11,919 foundation by the end of the quarter 432 00:18:17,110 --> 00:18:14,640 this stand nearest completion is for the 433 00:18:19,990 --> 00:18:17,120 s2 stage 434 00:18:22,710 --> 00:18:20,000 in mtf's test complex work also 435 00:18:25,590 --> 00:18:22,720 progressed on a second s2 stand 436 00:18:27,750 --> 00:18:25,600 and on the dual position s1c static test 437 00:18:30,230 --> 00:18:27,760 stand 438 00:18:32,150 --> 00:18:30,240 in other areas of mtf buildings such as 439 00:18:33,510 --> 00:18:32,160 the office and administration building 440 00:18:35,669 --> 00:18:33,520 were completed 441 00:18:37,350 --> 00:18:35,679 while others took form so that the 442 00:18:39,750 --> 00:18:37,360 entire site began to shape into the 443 00:18:41,830 --> 00:18:39,760 comprehensive rocket testing facility it 444 00:18:45,510 --> 00:18:41,840 is destined to be when operations 445 00:18:48,230 --> 00:18:45,520 commence almost a year from now 446 00:18:49,990 --> 00:18:48,240 in summary this report period witnessed 447 00:18:52,230 --> 00:18:50,000 the accomplishment of an outstanding 448 00:18:54,549 --> 00:18:52,240 number of major milestones 449 00:18:57,430 --> 00:18:54,559 the s1c static firing stage was 450 00:18:59,909 --> 00:18:57,440 completed and made ready for testing 451 00:19:02,150 --> 00:18:59,919 the first s2 stage battleship firing was 452 00:19:04,150 --> 00:19:02,160 successfully conducted and the assembly 453 00:19:05,270 --> 00:19:04,160 of the s2 structural test stage was 454 00:19:07,990 --> 00:19:05,280 completed 455 00:19:10,230 --> 00:19:08,000 the first s-4b stage for use in dynamic 456 00:19:11,909 --> 00:19:10,240 testing was delivered to nasa and 457 00:19:13,990 --> 00:19:11,919 testing was begun 458 00:19:17,110 --> 00:19:14,000 the f-1 engine flight rating test 459 00:19:19,510 --> 00:19:17,120 program was successfully concluded 460 00:19:21,270 --> 00:19:19,520 the j-2 engine demonstrated its restart 461 00:19:23,270 --> 00:19:21,280 capability 462 00:19:24,789 --> 00:19:23,280 vibration testing of the instrument unit 463 00:19:27,029 --> 00:19:24,799 got underway 464 00:19:29,510 --> 00:19:27,039 as well as dynamic testing as part of 465 00:19:30,870 --> 00:19:29,520 the saturn 1b vehicle 466 00:19:33,190 --> 00:19:30,880 and new facilities such as the 467 00:19:35,029 --> 00:19:33,200 mississippi test facility moved still 468 00:19:37,590 --> 00:19:35,039 closer toward the time when they will